12/12/04: The curtains are hung, the trash drawer is fixed, and I am beginning to settle into all the rooms. It's an adjustment since I was so used to only using two rooms at a time. The exterior hasn't changed much in the last couple of months, but I now have gutters and a screen door.

The living room and dining room have a very nice flow. I have already had my first formal dinner party! I invited my neighbors over to thank them for putting up with seven months of construction, construction vehicles, construction workers, construction debris...

Curtains at the bottom of the stairs (kitchen) and in the upstairs hallway.

This is the mirror that provided the basis for the craft room upstairs. I can't let you see the rest of the room right now as it is a disaster from when I abandoned it for the living room. Plus there are Christmas presents spread out everywhere!

The master bedroom and bathroom haven't changed much from week 25.

I'm still trying to figure out where I put everything in the kitchen. I'm really enjoying all the counterspace, and I can still see the TV from the sink!

That's all folks! Thanks for tuning in. With all the extra space, the Lang B&B-Southern New England is now accepting reservations :)

12/5/04: Sorry I've been delinquent in updating. Construction was finished in week 29 (the week of Nov 15-19), with two exceptions: the dishwasher ran one load and died, and the trash drawer in the kitchen doesn't open and close properly. The cabinet guy is coming on 12/6 to fix the drawer. The dishwasher, after many phone calls and cancelled appointments, has been replaced and is running like a dream. I owe my life to Dan at Sears.

Now all that's left is unpacking and decorating. I spent the entire day hanging curtains - I can't believe how long that takes. There will be pictures next week. To tide you over, here is a picture taken just before Thanksgiving, showing the living room with curtains.

 