Week 18 (August 30-September 6):

***Click on the thumbnails to see a larger view. Use your browser's Back button to return to this page.***

All of the trim got done this week, with the exception of the kitchen - that will be done after the cabinets are installed.

The woodwork was delivered first thing on Monday. The house felt (and smelled) like a woodshop all week.

I now have a linen closet upstairs...

...window seats with storage and built-in shelves in the bedrooms...

...bannisters and stair rails...

...baseboards, windowframes, and doors (1. master bedroom doors to closet and to hall; 2. door at back of master closet to storage area)

Saturday, they installed the upstairs bathroom cabinets.

Over the weekend I bought all the light fixtures for the electrician to install.

Meanwhile, I posted my old living room set on craigslist and it was sold within 48 hours! They picked it up Sunday, so I now have extra space in the living room and in the storage unit. It's a great site to buy and sell, and it's one less thing I have to worry about.