Week 1: Digging starts, cement footings are poured.

Week 2: Basement walls are poured.

Week 3: Backfill and basement floor.

Week 4: Framing of the kitchen floor.

Week 5: Framing of the first floor (kitchen walls).

Week 6: The roof comes off.

Week 7: Framing of the second floor.

Week 8: Framing continues, including stairs.

Week 9: Roofing, framing of 2nd floor interior, start of electrical.

Week 10: Electrical work continues, mobile storage unit is delivered.

Week 11: Packing, packing and more packing.

Week 12: Installation of windows, plumbing.

Week 13: Tearing down the walls!

Week 14: Siding, electrical.

Weeks 15-16: Vacation, insulation, drywall.

Week 17: Plastering.

Week 18: Trim work - baseboards, doors, built-ins.

Week 19: Front step.

Week 20: Painting.

Week 21: Paint and carpet upstairs, install kitchen cabinets.

Week 22: Template counters; install bathroom and kitchen flooring, bathroom tile.

Week 23: Fix kitchen flooring; finish upstairs electrical.

Week 24: Install blinds; deliver appliances and bedroom furniture; install kitchen counter.

Week 25: Finish plumbing in kitchen and bathroom; move upstairs.

Week 26: Install master closet,shower door; tear up old carpet.

Week 27: Paint and carpet downstairs; drop-ceiling and retile in downstairs bathroom; living room furniture.

Week 28: Finish tiling bathroom; dining room furniture; final walk-through, inspections.

[Week 29]: Finish the last few punchlist items, start unpacking, decorating. See the end results here.