Week 26 (October 25-29):

***Click on the thumbnails to see a larger view. Use your browser's Back button to return to this page.***

The hardware in the bathroom has been installed, including the shower door.

The closet was installed Thursday by Closets By Design. The short, eaved wall has 2 sets of drawers and 2 sets of shoe shelves topped with a counter. The full-sized wall has a long-hanging rod, several shelves, and two short-hanging rods.

The old rug was completely torn up on Friday. Everything downstairs now has this weird echoy sound.

 