Week 9 (June 28-July 2):

***Larger images have been removed to conserve space.***

Monday: Framing of the second floor extension is completed.

Tuesday: Roofing is done. These guys work fast! The carpenters start framing the inside walls. This view is of the guestroom from the master bedroom, through the bathroom. (Don't worry, the walls will be closed!)

Wednesday: Tyvek wrapping starts in preparation for the siding. The inside framing continues. Inside views are: (1) master bedroom looking back to front - the opening on the right will have built-in shelves and drawers; (2) master bedroom looking front to back toward the closet (stairwell in center of picture).

Thursday: (1) The portico goes up. (2) Basement stairs are framed. (3) Master bedroom from back of closet looking toward the front of the house. (4) Second bedroom looking toward the front of the house. This will also have built-in shelves and drawers.

Friday: The framing is done upstairs, and the electrician has started the rough wiring. The small blue and gray boxes in the pictures will be outlets, light switches and phone jacks. There will also be a cable connection in each room.

Next week the construction company is on vacation; the electrician will continue to work, and the windows may be installed if they are delivered, but there will not be much work done otherwise.

 